Greetings from Panama! My name is Marina Ehrman and I have been a professional tour guide and promoter for Panama Tourism and Travel Company since 2005. I love what I do and am proud to share what my country has to offer. It is filled with endless leisure and commercial attractions, friendly happy people who open their doors to all visitors. Panama is a country of incomparable natural beauty with a variety of tourist attractions, beautiful beaches in the Pacific and Caribbean. The tropical climate year round with its diversified flora, fauna and indigenous groups make it one of the most important of Ecotourism in Latin America. I invite you to know our country’s history, culture and also enjoy the cuisine, folklore and traditions that only a place in the world can provide………Panama! Contact me and I’ll organize your visit and will be happy to welcome you in Panama. For more information on Panama, follow my Facebook page and my blog. Visit www.panamatourismtravel.com

Expansion plan and the New Panamax




As early as the 1930s, new locks were proposed for the Panama Canal to ease congestion and to allow larger ships to pass. The project was abandoned in 1942.

On October 22, 2006, the Panama Canal Authority (with the support of the Electoral Tribunal) held a referendum for Panamanian citizens to vote on the Panama Canal expansion project. The expansion was approved by a wide margin, with support from about 78% of the electorate. It is estimated that the project will be completed by 2014 and will cost $5.3 billion; this sum is expected to be recovered within 11 years.

The plans to build bigger locks have led to the creation of "New Panamax", based on new lock dimensions of 1,400 ft (427 m), beam 180 ft (55 m) and depth 60 ft (18.3 m). Naval architects and civil engineers are already taking into account these dimensions for container ships. The world's largest cruise ship, the Oasis of the Seas, has almost New Panamax dimensions but her height may prevent her passing under the Bridge of the Americas even at low tide.

After this expansion, the Panama Canal will be able to handle vessels of cargo capacity up to 13,000 twenty-foot equivalent units (TEU); currently, it can only handle vessels up to about 5,000 TEU. A third set of locks—1,400 ft (426.72 m) long, 180 ft (54.86 m) wide, with a draft of 60 ft (18.29 m)—will supplement the two existing sets.

However, even before the revised dimensions were announced, the Maersk E-class—like the Emma Maersk, the future Maersk Triple E Class, as well as many large tankers (ULCCs) and some bulk carriers (VLOCs)—will not be able to pass through even the new, much larger locks. The Maersk E and Triple E Class are too wide for even the new locks.

Several ports, including the ports of New York, Norfolk, and Baltimore, all in the northeastern US, have already increased their depth to at least 50 feet (15 m) to accommodate these changes, and the Port of Miami has recently approved doing the same in a project known as the "Deep Dredge" and will be the closest deep water port to the Panama Canal in the US. The Port Authority of New York and New Jersey is planning to raise the clearance of the Bayonne Bridge to 215 feet (66 m), at a cost of $1 billion, to allow New Panamax ships to reach container port facilities in New Jersey.

Post-Panamax Ships


Tour Suggested






 More Tour Options www.panamatourismtravel.com


Post-Panamax or over-Panamax denote ships larger than Panamax that do not fit in the canal, such as supertankers and the largest modern container ships. The "largest oil tanker in the world"—whichever ship held the title at the time—has not been able to transit the Panama Canal at least since the Idemitsu Maru was launched in the 1960s; she was about 150,000 deadweight tons. U.S. Navy supercarriers are also in the post-Panamax class; the Nimitz class aircraft carriers are 1,092 ft (332.84 m) long overall with a beam of 134 ft (40.84 m), while the flight deck is 252 ft (76.81 m) wide.

Panamax and New Panamax






Tour Suggested

More Tour Options www.panamatourismtravel.com

Panamax and New Panamax are popular terms for the size limits for ships traveling through the Panama Canal. Formally, the limits and requirements are published by the Panama Canal Authority (ACP) titled "Vessel Requirements". These requirements also describe topics like exceptional dry seasonal limits, propulsion, communications and detailed ships design.

The allowable size is limited by the width and length of the available lock chambers, by the depth of the water in the canal and by the height of the Bridge of the Americas. Ships that do not fall within the Panamax-sizes are called Post Panamax. The limits have influenced those constructing cargo ships, giving clear parameters for ships destined to traverse the Panama Canal.

"Panamax" has been in effect since the opening of the canal in 1914. In 2009 the Canal management published the "New Panamax",  that will be in effect when the third lane of locks, larger than the current two, are operational from 2014.

The increasing prevalence of vessels of the maximum size is a problem for the canal as a Panamax ship is a tight fit that requires precise control of the vessel in the locks, possibly resulting in longer lock time, and requiring that these ships transit in daylight. Because the largest ships traveling in opposite directions cannot pass safely within the Gaillard Cut, the canal effectively operates an alternating one-way system for these ships.

Teodoro Roosevelt visit during the Panama Canal construction


The 26th U.S. president, Theodore “Teddy” Roosevelt, was the first president to visit a foreign country. His enthusiasm for the Panama Canal project led him to see it for himself in November 1906.

In anticipation of his visit Panamanians and Zonians alike went into overdrive to make the place presentable. David McCullough writes in his seminal book, Path Between the Seas:,

Advanced preparations involved the efforts of thousands of people. . . . streets were scrubbed, houses were painted or whitewashed, flags were hung from windows and balconies. Programs were printed, schoolchildren were rehearsed in patriotic airs. The Republic of Panama declared his day of arrival a national day of “joy and exalted enthusiasm” and instructed the populace to behave, since “all thinkers, sociologists and philosophers of the universe [will] have their eyes upon us in penetrating scrutiny.”

At Ancon, construction of a big three-story frame hotel called the Tivoli, a structure begun the year before but still far from finished, rushed ahead with all speed as soon as Stevens learned of the visit. One wing of the building was finished and furnished in six weeks.

Once Roosevelt arrived he was not the most obliging to his hosts. At one point he pulled Dr. William Gorgas into his carriage then slipped out the other side with him for an impromptu inspection of Ancon Hospital. Later he would report their medical accomplishments were astounding.

image

The President toured the bay in a tug boat and then popped in for a surprise visit and lunch at an employee mess hall instead of showing up for the luncheon in his honor at the Tivoli. He took the site-seeing train to Culebra Cut where he walked the railway ties. He was continuously pointing out the things he wanted to see and demanded to see them, even going so far as to inquire of black workers if they had any complaints. In his enthusiasm he inspected everything from dam sites, to steam shovels, to kitchens, to military troops. Teddy’s secret service men frantically scurried around trying to keep up as he dashed around the Canal Zone. Standing at the back of the train, he waved his hat and flashed his toothy smile at the children lined up to wave flags as he passed.

After his whirlwind three-day visit everyone complained of exhaustion. As for Teddy, his only regret was that he didn’t have time to explore Panama’s tropical forest. He wrote in a letter to his son Kermit,

All my old enthusiasm for natural history seemed revived, and I would have given a good deal to have stayed and tried to collect specimens

Panama Canal Locks Gates








The gates which separate the chambers in each flight of locks must hold back a considerable weight of water, and must be both reliable and strong enough to withstand accidents, as the failure of a gate could unleash a catastrophic flood of water downstream.

These gates are of enormous size, ranging from 47 to 82 ft (14.33 to 24.99 m) high, depending on position, and are 7 ft (2.13 m) thick; the tallest gates are required at Miraflores, due to the large tidal range there. The heaviest leaves weigh 662 t (730 short tons; 652 long tons); the hinges themselves each weigh 16.7 t (36,817 lb). Each gate has two leaves, 65 ft (19.81 m) wide, which close to a V shape with the point upstream; this arrangement has the effect that the force of water from the higher side pushes the ends of the gates together firmly. The gates can only be opened when, in the operating cycle, water level on both sides is equal.

The original gate machinery consisted of a huge drive wheel, powered by an electric motor, to which was attached a connecting rod, which in turn attached to the middle of the gate. These mechanisms were replaced with hydraulic struts beginning in January 1998, after 84 years of service. The gates are hollow and buoyant, much like the hull of a ship, and are so well balanced that two 19 kW (25 hp) motors are enough to move each gate leaf; if one motor fails, the other can still operate the gate at reduced speed.
Each chamber also contains a pair of auxiliary gates which can be used to divide the chamber in two; this is designed to allow for the transit of smaller vessels — such as canal tugs — without using the full quantity of water. They were originally incorporated because the overwhelming majority of all ships of the early 1900s were less than 600 ft (183 m) in length, and would therefore not need the full length of the lock chamber. Nowadays these gates are rarely used; instead, small boats such as tour boats, tugs, and yachts are passed in groups.

Panama Canal Locks Dimensions


Tour Suggested
More tour options: www.panamatourismtravel.com

Each lock is 33.53 meters (110 feet) wide by 304.8 meters (1,000 feet) long



The maximum dimensions of ships that can transit the Canal are: 32.3 meters (106 feet) in beam; 294.3 meters (965 feet) long (depending on the type of vessel); and 12 meters (39.5 feet) of draft (depth reach) in Tropical Fresh Water.








Who made the commemorative Gaillard plaque?



The bronze sculpture of the Gaillard plaque was the work of the notable american artist James Earl Fraser in 1927. It was manufactured by Kuntz Foundry of New York. On February 4th, 1928 the plaque was dedicated to the memory of Colonel David DuBoise and was placed on Contractor's Hill. It was removed from Contractor's Hill, due to the cut widening project and relocated at the steps of the Administration Building. The plaque was a gift from the Gaillard family.

The Panama Canal tugboat fleet



Tour Suggested

Tugboats are floating equipment that assist vessels during their transits especially at the entrances and exits of the locks and during their transit through Gaillard Cut, where a great maneuverability and power is required











Gaillard Cut


Tour Suggested







The Gaillard Cut, or Culebra Cut, is an artificial valley that cuts through the continental divide in Panama. The cut forms part of the Panama Canal, linking Lake GatĂșn, and thereby the Atlantic Ocean, to the Gulf of Panama and hence the Pacific Ocean. It is 12.6 km (7.8 mi) from the Pedro Miguel lock on the Pacific side to the Chagres River arm of Lake Gatun, with a water level 26 m (85 ft) above sea level.
Construction of the cut was one of the great engineering feats of its time; the immense effort required to complete it was justified by the great significance of the canal to shipping, and in particular the strategic interests of the United States of America.

Construction

French work

As described in History of the Panama Canal, the excavation of the Culebra Cut was begun by a French venture, led by Ferdinand de Lesseps, which was attempting to build a sea-level canal between the oceans, with a bottom width of 22 metres (72 ft). Digging at Culebra began on January 22, 1881. A combination of disease, underestimation of the problem, and financial difficulties led to the collapse of the French effort, which was bought out by the United States in 1904. The French had excavated some 14,256,000 m³ (18,646,000 cubic yards) of material from the cut, and had lowered the summit from 64 metres (210 ft) above sea level to 59 metres (193 ft), over a relatively narrow width.


American work




The United States took over on May 4, 1904. Under the leadership of John F. Stevens, and later George Washington Goethals, the American effort started work on a wider, but not as deep a cut, as part of a new plan for an elevated lock-based canal, with a bottom width of 91 metres (300 ft); this would require creation of a valley up to 540 metres (a third of a mile) wide at the top. A vast amount of new earthmoving equipment was imported, and a comprehensive system of railways was constructed for the removal of the immense amounts of earthen and rocky spoil.

Major David du Bose Gaillard, of the U.S. Army Corps of Engineers, joined the project at the same time as Goethals, and he was put in charge of the central district of the canal, which was responsible for all of the work between Gatun Lake and the Pedro Miguel locks — most notably, the Culebra Cut. Gaillard brought dedication and quiet, clear-sighted leadership to his difficult, complex task.
The scale of the work was massive. Hundreds of large steam drills bored holes in which were planted tons of dynamite, which blasted the rock of the cut so that it could be excavated by steam shovels. Dozens of spoils trains took the spoil from the shovels to the landfill dumps, about twelve miles (19 km) away. In a typical day, 160 trainloads of material were hauled away from a cut nine miles long (14 km). This workload on the railroads required some skillful co-ordination. At the busiest times, there was a train going inbound or outbound almost every minute.

Six thousand men worked in the cut, drilling holes, placing explosives, controlling steam shovels, and running the dirt trains. They also moved and extended the railroad tracks as the work moved forward. Twice a day work stopped for blasting, and then the steam shovels were moved in to take the loose spoil (dirt and rock) away. More than 600 holes filled with dynamite were fired daily. In all, 60 million pounds (27,000 tonnes) of dynamite were used. In some locations, about 52,000 pounds (23.6 metric tonnes) of dynamite were planted and detonated for a single blast.

Landslides
The excavation of the cut was one of the greatest areas of uncertainty in the creation of the canal, due to the unpredicted large landslides. The International Board of Consulting Engineers had mistakenly decided that the rock would be stable at a height of 73.5 metres with a slope of 1 in 1.5; in practice, the rock began to collapse from that slope at a height of only 19.5 metres. The misjudgment was in part due to unforeseen oxidation of the underlying iron strata due to water infiltration, which caused weakening and eventually a collapse of the strata.

The first and largest major slide occurred in 1907 at Cucaracha. The initial crack was first noted on October 4, 1907, followed by the mass wasting of about 382,000 m³ (500,000 cubic yards) of clay. This slide caused many people to suggest the construction of the Panama Canal would be impossible; Gaillard described the slides as tropical glaciers, made of mud instead of ice. The clay was too soft to be excavated by the steam shovels, and it was therefore largely removed by sluicing it with water from a high level.

After this, the sediment in the upper levels of the cut was removed, resulting in less weight over the weak strata. The slide still continued to cause minor problems after this

Completion

Steam shovels broke through the Culebra Cut in May, 1913. The Americans had lowered the summit of the cut from 59 metres (193 ft) to 12 metres (40 ft) above sea level, at the same time widening it considerably, and they had excavated over 76 million cubic metres (100 million cubic yards) of material. Some 23 million cubic metres (30 million cubic yards) of this material was additional to the planned excavation, having been brought into the cut by the landslides.

Gaillard died from a brain tumor in Baltimore, Maryland, on December 5, 1913, having been promoted to colonel just one month prior, and hence he never saw the opening of the canal in 1914. The Culebra Cut, as it was originally known, was renamed to the Gaillard Cut on April 27, 1915, in his honor

Panama Canal Administration Building



Tour Suggested
More tour options : www.panamatourismtravel.com


The Panama Canal Administration Building was inaugurated on July 15, 1914, exactly a month before the official opening of the Canal. According to records dating back to the construction era, the entire building cost $879,000, a sizeable sum at the time.

The building is at the top of a hill, prominently overlooking the Canal, the town and port of Balboa, and parts of Panama City. The Administration Building serves as the headquarters of the Panama Canal Authority (ACP) and houses administrative offices. Of particular interest to tourists are the Administration Building's colorful murals that adorn the ceiling of the inner rotunda. These murals were painted by New Yorker William B. Van Ingen, who is also known for his murals in the U.S. Library of Congress, and the Philadelphia Mint.

They depict the monumental labor involved in building the Canal through four scenes: the Culebra Cut excavation, the Gatun Dam Spillway construction, the Miraflores locks construction and the building of one of the colossal lock gates. These murals commemorate the efforts, courage, and heroism of the multinational workforce dedicated to building the famous canal that united the world's two greatest oceans.







Construction of the Miraflores Locks

The panel depicted here shows construction of a side wall culvert at Miraflores Locks. The huge locks culverts, that direct the flow of water, are large enough to drive a train through. The murals tell the overall story of the building of the Panama Canal in four main scenes, which show Gaillard Cut at Gold Hill, where the Canal passes through the Continental Divide; the building of the spillway of Gatun Dam, which dams the Chagres River to create the Gatun Lake; construction of a lock miter gate; and the Miraflores Locks near the Pacific entrance to the Canal. The frieze below presents a panorama of the excavation of Gaillard Cut. The power of these vividly portrayed scenes has the effect of linking all who view them in an unbroken chain with those engineering masters and the heroic work force that created the Canal.

Gatun Dam Spillway Construction

Construction of the Gatun Dam spillway is shown here. Gatun Lake was formed by the damming of the Chagres River, and the dam's fourteen spillway gates maintain the lake at 85 feet above sea level. At the time of its formation, Gatun Lake was the largest manmade lake in the world
The Culebra Cut

Excavation through the Continental Divide, shown here, required digging down some 270 feet through the lowest of this mountainous area to form the bottom of the Canal in Gaillard Cut. The Canal's original width in the Cut was 300 feet, and trains were used to haul away some 262 million cubic yards of earth and rock from this area.
Restorer's Remarks: "The Panama Canal murals in the Administration Building rotunda are the masterpiece of their creator, artist William B. Van Ingen. The light, impressionist colors reflect the atmospheric quality of Panama and the bold compositions commemorate in pictorial form, the actual building of the Panama Canal. Over the years, mold and dirt settled on the murals necessitating cleanings in 1929, 1932, 1939, 1960 and 1993. During the 1993 conservation effort, over 22,000 cotton swabs were used to clean the murals of dirt and grime, as well as old overpaint that was covering many areas of the mural, particularly the sky of the frieze. The cleaning was accomplished with a combination of cleaners that removed the grime and old varnish, but did not harm the murals. A few areas of touch-up were needed, though not many, as the murals were in good condition despite previous cleanings. The entire project was documented with video and hundreds of photos, both black and white and color, and an extensive written report was prepared in English and Spanish to serve as a guide for any future restorations.


Canal Lock Gate Under Construction

This panel shows a partially completed lock gate. Steel structure 65 feet wide and 7 feet thick, lock gates vary in height from 47 to 82 feet and weigh from 390 to 730 tons. The Canal uses some 80 of these gate leaves at the various locks. Canal Chief Engineer George W. Goethals is credited with having the foresight to ensure that a record of the monumental labor involved in the building of the Canal was preserved in this art form, so that all who come after might not only marvel at what was accomplished and appreciate its grandeur, but might share in the sense of pride and commitment that this magnificent achievement has always evoked, not only in those who built the waterway, but also in all who have been involved, throughout the years, in its operation and administration.

Goethals chose carefully the person who would be entrusted with this special project, selecting William B. Van Ingen of New York, an outstanding artist who had achieved considerable fame for his murals in the Library of Congress in Washington, D.C. and the U.S. Mint in Philadelphia. Van Ingen agreed to produce the murals at $25 per square foot, which was the way such work was contracted for in those days, and the finished murals cover about 1,000 square feet. Van Ingen and two assistants, C.T. Berry and Ira Remsen, made charcoal sketches of Canal construction activities for the mural during two visits to Panama in 1914, while on the latter of the construction work. Van Ingen then painted the murals on separate panels in his New York studio. The panels were shipped to Panama and installed over a 3-day period in January 1915 under the artist's personal supervision. The paintings have the distinction of being the largest group of murals by an American artist on display outside the United States.

Van Ingen identified completely with the Canal work. In discussing the murals at that time, he said he had become so caught up in the construction effort that he felt that he, too, was a Canal worker. He said, "I forgot I was an artist and had genuine regret at not being entitled to a number and a brass identification badge." According to Van Ingen, his challenge in producing the murals had been how to portray the magnitude of the Canal construction. In explaining his approach to the task, he said, "I tried to compose into one picture the views to be seen from different standpoints, but united in the mind. It enabled me to combine different periods of time in the construction work." Commenting on his perspective in composing the paintings, he added, "Any success the paintings may have had, came, I believe, from an endeavor to see with the eyes of the man in the ditch."

The murals were restored in 1993 by art conservator Anton Rajer, of Madison, Wisconsin, and rededicated in a special ceremony on September 29, 1993.